Film mulching process:
A detailed description of the automatic technology and equipment
for film covering sand is made in detail. The production line of
the film coated sand is first made by three sand silos for the
original sand No. 1 bucket 2 bucket and 3 iron sand bucket at the
bottom of the three mouths designed for three pneumatic switches.
It is a little far away from the electron, so the spiral feeder is
used to put the iron sand into the electron, and the raw sand and
the iron sand are quickly added to the roller reheating furnace
after the electronic proportioning is added to the roller reheating
furnace. The sand of the roller reheating furnace is joined by
2min30s, and the suitable heating temperature goes to the mixed
sand. In the machine, the process of sand unloading requires 20S,
the roller is in the reverse state, when the roller is unloaded,
the roller is stopped from the reversal state to the turn, then
second is heated and the sand under the sand mixer begins to add
resin. The resin electronics calls the reserve fighting valve open,
and then closed, the tree is closed. The tree is closed and the
tree is closed after closing. The two resin reserve hopper above
the fat (without a ratio with a resin bucket is also possible) to
be added to the resin required by the electronically called
internal phase by the spiral feeder. After the resin is weighed,
the spiral feeder stops, the resin electronic call door is opened,
and the signal is put into the weighing reserve bucket to wait for
the next signal, after mixing 50-70S. At this time, the signal is
transferred to the metering pump (time measurement) to add a
certain amount, and then mixed with calcium powder after mixing
40-60S. After receiving the signal, the calcium powder is turned on
the reserve fighting pneumatic door above the mixer, then closed,
and the spiral feed is added to the calcium powder reserve bucket
(time measurement) to wait for the next addition. Enter. 5S rear
bottom air blower is unloaded after 10-30s, and after unloading
(15s), the pneumatic door of the mixer is closed. In this analogy,
we can write a relative procedure according to the technology
required by your company.
Cooling part
After the sand mixer is unloaded, the coated sand is broken through
the vibrating crushing screen and then into the first cooling after
the hoist, then the vibration boiling and cooling, then the second
channel cooling, the lengthening of the water cooling roller, and
the hoist to the storage silo after the hoist is hoisted.