




Film mulching process: With reference to the automatic process and
equipment of coated sand, the production line of coated sand
designed by our company is first designed to design three pneumatic
switches at the bottom of the original sand bucket No. 1 and No. 2
and the third iron sand bucket, respectively. According to the
process, the raw sand and the iron sand needed to be dropped in the
bottom of the electronic weighing system are used. The iron sand is
slightly farther away from the electronic weighing, so the screw
feeder is used to place the iron sand in the electronic scale. It
takes 20s to add the raw sand and iron sand to the secondary
process of the drum heating furnace quickly after the electronic
proportioning of the raw sand and iron sand, and the sand of the
drum heating furnace is added by 2min30s. It takes 20s to unload
the sand into the mixer at the right heating temperature, and the
drum is in reverse state, and when the sand is unloaded, the drum
stops from the reverse state to turn back, and then the second
heating begins. The sand under the mixer begins to add resin after
15 s. The resin is electrically called the lower resin weighing
bucket pneumatic door to open and close after adding. The two resin
storage hops above the resin (which need not be matched with one
resin hopper) are added to the resin needed by the electronic
weighing inner phase separately through the screw feeder. After the
resin weighing is finished, the screw feeder stops, and the resin
electronic weighing starting door is opened. Put it into the
weighing hopper and wait for the next signal, mix the 50-70S
aftercare product, when the signal is passed to the metering pump
(time metering) and add a certain quantity, then mix the 40-60S and
add the calcium powder, After receiving the signal, the calcium
powder is opened by the air valve of the reserve bucket that is
poured by the screw feed material above the sand mixer, and then
closed after discharge. Screw feeders are added to the calcium
powder storage bucket (time metering) again, waiting for the next
addition. 5 s after the bottom blast cooler opens 10-30s to unload
the sand, after unloading the sand (15 s), the mixer pneumatic door
closes, and so on, and so on. Synthetically because each company
craft different season is different we may according to your
company need craft to write the relative procedure in this does not
do one elaboration here forgets the understanding. Cooling part
After unloading the sand mixer, the coated sand is first crushed by
vibrating crushing screen, then into the first cooling line after
the hoist, then into the second cooling channel, then into the
second cooling, lengthening the water cooling drum, and then to the
hoist hoist to reach the reserve sand bin.